Category Archives: Building

2013-08-10

– North ramp has been backfilled and compacted. Awaiting railings.
– Placed 6 spare patio blocks on the north ramp landing.
– Dome has been pressure washed, taped, sealed, and painted.
– Dome shutters have been painted.
– New flooring was installed in the dome room, stairwell, dome hallway, and control room.
– Replaced the furnace filter.
– Reattached the edging laminate to several classroom tables.
– Weatherstripped the north classroom door.
– Cleaned and restocked the bathroom.
– Repaired one section of the west soffit.
– Scraped and painted the south gable end and soffit.
– Reinstalled missing flashing on the large dome shutter.
– Removed excess material from the classroom to the basement.
– Swept and washed the classroom and hallway floors.
Many, many volunteers!

2013-08-01

Trimmed 1/4″ off the bottom of the green door, checked the bathroom door for latching, and installed screws in the bottom hinge of the broom closet door. Adjusted the lower slot door counterweight outward.
Jim