The Dome seal is 80% complete, one 8′-0″ section is ready for installation on the northeast quadrant except drilling for brackets. The plywood top plate upstand has been trimmed flush, and roller station blocking has been chamfered to increase clearance to the dome flashing. The more flexible belting is too flexible and sags at the roller stations, so 10′-0″ more of the stiff belting is required to complete the work.

Maurice