Monthly Archives: October 2009

2009/10/12

Moved Belkin UPS unit to the classroom, installed software. Classroom computer, monitor and printer are now powered from this unit. Mounted Cyberpower UPS unit in basement equipment bay, installed software. Meteor, SonofSOL, RMOB computers, and all peripheral meteor monitor equipment, modem, hubs, etc are now powered from this unit.

Glen

2009/10/09

Until the telescope tracking rate problem is isolated and corrected, adjustment of the telescope tracking speed can be accomplished by pressing the ESC key on the hand pad while pressing the down arrow 4 times. This will slow the tracking rate down to the correct speed. This adjustment must be made every time the telescope servo controller is powered up.

Glen